...but not funished. Rhrett Connor and his crew have completed their job, and we are very happy with the results - they really do high quality work, and were done sooner than we expected. Our next step is for Steve to stain the interior and exterior of the cabins, install flooring, wood stove, bathroom fixtures, and some other finish work. We will also apply "chinking" to the exterior of the bldgs. at some point, after the logs dry out some. We also need to get the septic system installed and plumbed in before we can really utilize the cabins.
We plan to head out again next weekend (this will make 4 weekends in a row). The kids are ready for a break, but we've got to get the stain sprayed on before it starts raining. We are really excited about how everythng is turning out, and feel very fortunate that we are able to move forward on our long-time dream of having our own cabin in the woods!
Sunday, September 14, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Hey, this is very cool. It needs a firepit ASAP. Love the updates.
Post a Comment