Another fun and busy weekend at the cabin. Last week, mom welded up a metal frame for the fire brick cooking surface on the pizza oven. Steve slid it into place, and placed the fire brick tiles to form a perfect fit. He then began construction of the dome: forming a sand pile roughly the size of the oven interior, covered with a 3-inch thick clay layer (done in two stages). Once this dries (who knows when, in our NW climate) another clay layer mixed with hay will form an insulating layer.
The boys enjoyed playing with the clay, digging holes, bike riding and a campfire.
Sunday, May 2, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment